Integridade na Linha gains momentum with visit to RNEST

On October 22 and 23, 2025, Gustavo Antunes, Compliance Officer at Odebrecht, and Gabriel Cabral, responsible for Culture, Communication, and Integrity Training, visited the Abreu e Lima Refinery (RNEST) as part of the actions of the Integridade na Linha initiative.

The initiative aims to strengthen the relationship of trust and proximity between the Integrity area and small businesses, and it is structured around four pillars aligned with our Values:

1.    Engagement with the Projects
2.    Co-creation & Active Listening

Guaratuba Bridge

The bridge will connect the cities of Guaratuba and Matinhos, on the state's coast, 130 km from the capital Curitiba. It is the result of a R$ 386.9 million investment by the Government of Paraná, through the Department of Roads and Highways (DER/PR), an agency linked to the State Secretariat of Infrastructure and Logistics. The work is being carried out by the Nova Ponte Consortium, formed by Odebrecht Engineering & Construction, Carioca Engineering, and Goetze Lobato Engineering.

Cabinda Refinery

The project results from a partnership between Gemcorp and Sonangol, through a joint venture in which Gemcorp holds 90% of the capital and Sonangol 10%. In its first phase, this modular refinery will process up to 30,000 barrels of crude oil per day, supplied by Sonangol, and will double its capacity to 60,000 barrels/day after the completion of the second phase, which is already underway.

Petrobras and Tenenge Advance Construction of New Unit at RNEST

The Abreu e Lima Refinery (RNEST), located in Pernambuco, is about to receive a strategic boost to its processing capacity with the construction of the Naphtha Hydrotreatment Unit (UHDT-N), also known as U-34. The project, led by Tenenge, the industrial engineering and construction company of Odebrecht Engenharia e Construção, marks a new phase in Petrobras’ infrastructure expansion in the Northeast.

Replanting Action Reinforces Sustainable DNA in Odebrecht's Construction Projects

In light of the ongoing interventions in the Ring Road and Campo Grande Road Connection projects, carried out by Odebrecht Engineering & Construction in the West Zone of Rio de January, the Environmental department is promoting the preservation of species through the transplantation of trees that would otherwise be removed to enable the construction of a viaduct. The trees were relocated to the front of the Ana Gonzaga Park Palace, adding value to public heritage and reinforcing the company’s commitment to sustainability.

Odebrecht Angola carries out several initiatives in recognition of Yellow September

In reference to the month dedicated to suicide prevention awareness, Yellow September, Odebrecht Angola’s projects promoted various actions to highlight the importance of mental health in the workplace.

Under the theme “Self-care and mental health in the workplace”, delivered by guest speaker Dr. Sebastião André, Psychologist at the Provincial Health Office of Luanda, team members took part in an interactive and dynamic lecture, designed to both relax and focus on issues that may affect daily life, whether personal or professional.