OEC joins the movement which promotes integrity and transparency

On Tuesday (31/7), Odebrecht Engineering and Construction confirmed its commitment to the Business Movement for Integrity, Transparency and to Combat Corruption.
OEC joins the movement which promotes integrity and transparency

On Tuesday (31/7), Odebrecht Engineering and Construction confirmed its commitment to the Business Movement for Integrity, Transparency and to Combat Corruption.
ENR recognizes OEC for the sixth consecutive year
The São Paulo Subway Lilac Line, where lot 7 was constructed by the Metropolitano 5 consortium, formed by Odebrecht Engineering and Construction, Queiroz Galvão and OAS, was recognized by the North American magazine Engineering News-Record (ENR) – one of the main engineering publications in the world – as one of the best global projects in the Bridges and Tunnels category.
ENR recognizes OEC for the sixth consecutive year
The São Paulo Subway Lilac Line, where lot 7 was constructed by the Metropolitano 5 consortium, formed by Odebrecht Engineering and Construction, Queiroz Galvão and OAS, was recognized by the North American magazine Engineering News-Record (ENR) – one of the main engineering publications in the world – as one of the best global projects in the Bridges and Tunnels category.
Metro of Lisbon - Gare do Oriente
Construction of the station and a 526 m long tunnel for maneuvering and maintenance, including ventilation well.
Usina Hidrelétrica Baixo Iguaçu instala último conjunto gerador
A Usina Hidrelétrica Baixo Iguaçu realizou na última quinta-feira, dia 14, a descida do rotor da terceira unidade geradora. Este é o último grande equipamento a ser instalado na usina, que iniciou as suas obras em 2013 e agora entra em etapa de finalização.