Skip to main content

Important phase of the Sertão Canal is completed

  • Read more about Important phase of the Sertão Canal is completed

Canal-do-Sertão.jpg

OEC joins the movement which promotes integrity and transparency

  • Read more about OEC joins the movement which promotes integrity and transparency
Ethos_FJ.jpg
Crédito: Ivan Almeida/Ethos

On Tuesday (31/7), Odebrecht Engineering and Construction confirmed its commitment to the Business Movement for Integrity, Transparency and to Combat Corruption.

OEC joins the movement which promotes integrity and transparency

  • Read more about OEC joins the movement which promotes integrity and transparency
Ethos_FJ.jpg
Crédito: Ivan Almeida/Ethos

On Tuesday (31/7), Odebrecht Engineering and Construction confirmed its commitment to the Business Movement for Integrity, Transparency and to Combat Corruption.

ENR recognizes OEC for the sixth consecutive year

  • Read more about ENR recognizes OEC for the sixth consecutive year

Linha-5-SP.jpg The São Paulo Subway Lilac Line, where lot 7 was constructed by the Metropolitano 5 consortium, formed by Odebrecht Engineering and Construction, Queiroz Galvão and OAS, was recognized by the North American magazine Engineering News-Record (ENR) – one of the main engineering publications in the world – as one of the best global projects in the Bridges and Tunnels category.

ENR recognizes OEC for the sixth consecutive year

  • Read more about ENR recognizes OEC for the sixth consecutive year

Linha-5-SP.jpg The São Paulo Subway Lilac Line, where lot 7 was constructed by the Metropolitano 5 consortium, formed by Odebrecht Engineering and Construction, Queiroz Galvão and OAS, was recognized by the North American magazine Engineering News-Record (ENR) – one of the main engineering publications in the world – as one of the best global projects in the Bridges and Tunnels category.

Metro of Lisbon - Gare do Oriente

  • Read more about Metro of Lisbon - Gare do Oriente

Construction of the station and a 526 m long tunnel for maneuvering and maintenance, including ventilation well.

Usina Hidrelétrica Baixo Iguaçu instala último conjunto gerador

  • Read more about Usina Hidrelétrica Baixo Iguaçu instala último conjunto gerador

Baixo-Iguaçu.jpg A Usina Hidrelétrica Baixo Iguaçu realizou na última quinta-feira, dia 14, a descida do rotor da terceira unidade geradora. Este é o último grande equipamento a ser instalado na usina, que iniciou as suas obras em 2013 e agora entra em etapa de finalização.

Pagination

  • First page « First
  • Previous page ‹ Previous
  • …
  • Page 11
  • Page 12
  • Page 13
  • Page 14
  • Page 15
  • Page 16
  • Page 17
  • Page 18
  • Current page 19
Subscribe to